The Order updates the Dm March 11, 2008 , not just "balancing" the limits of transmittance of transparent closures (Windows and similar) and opaque (walls, roofs and floors), but also strengthens the criteria for the installation of biomass boilers . But let us proceed with order.
The new limits for the off-transmittance of 55% "windows"
On 1 January 2010 entered into force the new limits of transmission and primary energy needs, as provided for in Annexes A and B Ministerial Decree 11 March 2008. Compliance with these limits, more stringent than those required by the legislative decree 192/2005, costituisce un requisito indispensabile per poter accedere alle detrazioni fiscali del 55% per finestre, pareti, tetti e pavimenti (comma 345 della Finanziaria 2007).
Il Dm 26 gennaio 2010 interviene modificando la tabella 2 dell’ Allegato B , con i nuovi valori che – lo ricordiamo ancora – saranno richiesti per le spese sostenute a partire dal 15 marzo 2010. Come si può vedere dal confronto tra le tabelle sottostanti, i valori di trasmittanza delle finestre sono stati ritoccati verso il basso per le zone climatiche più calde (A e B) e verso l’alto per le zone climatiche più fredde (E and F), while remained unchanged in zones C and D.
Regarding walls (vertical opaque structures), the limits were made more stringent, on the contrary, they become a bit 'less demanding power requirements for floor and roof (with the exception of the roofs in climate zones E and F, whose values \u200b\u200bremain unchanged).
Note that the term " windows including frames " in the new table is replaced by " opening closures and similar ', accepting the broad definition introduced by Presidential Decree 59/2009, which includes in this category "windows, doors and windows even if not open, including the frames, whereas the transparent and / or opaque that make up".
Table 2, Annex B, Dm March 11, 2008 (U-values \u200b\u200brequired until March 15, 2010 )
| Area climate | Structures opaque vertical | opaque structures horizontal or inclined | Windows inclusive of fixtures | |
| Covers | floors (*) | |||
| A | 0.56 0.34 | 0.59 | 3.9 | |
| B | 0.43 0.34 0.44 | 2.6 | ||
| C | 0.36 | 0,34 | 0,38 | 2,1 |
| D | 0,30 | 0,28 | 0,30 | 2,0 |
| E | 0,28 | 0,24 | 0,27 | 1,6 |
| F | 0,27 | 0,23 | 0,26 | 1,4 |
| (*) Floor to unheated rooms or out | ||||
Table 2, Annex B, Dm March 11, 2008 (U-values \u200b\u200bin stead of the previous since March 15, 2010 )
| Area | Structures opaque vertical | horizontal or opaque structures inclined | opening closures and similar (**) | |
| Covers | floors (*) | |||
| A | 0, 54 | 0.32 0.60 3.7 | ||
| B | 0.41 0.32 0.46 | 2.4 | ||
| C | 0,34 | 0,32 | 0,40 | 2,1 |
| D | 0,29 | 0,26 | 0,34 | 2,0 |
| E | 0,27 | 0,24 | 0,30 | 1,8 |
| F | 0,26 | 0,23 | 0,28 | 1.6 |
| (*) to unheated rooms or floors to the outside | ||||
| (**) In accordance with Article 4, including but 4, letter c) Deldo ecret President 2 April 2009, n. 59, that setting a maximum value of the trans- mittanza (U) of the closing and opening a similar position, which windows, doors and windows even if not open, including the frames. | ||||
The DM also acts on paragraph 344 of the 2007 Budget on the overall energy re-building. This paragraph provides the opportunity to take advantage of the deduction for the replacement of heating systems with biomass boilers.
These are the U-values \u200b\u200bshown in Table 4.a of Article 4, paragraph 4, letter c) of Presidential Decree 59/2009, which in turn refers to ' Annex C of the legislative decree 192/2005 (shown below). It should be stressed that these particular requirements of transmittance is only required for actions carried out on buildings located in climatic zones C, D, E and F .
| Table 4a. Limit values \u200b\u200bof thermal transmittance U of transparent closures including the frames, expressed in W / m² K | |||
| Area climate | From January 1, 2006 U (W / m² K) | From January 1, 2008 U (W / m² K) | From January 1, 2010 U (W / m² K) |
| A | 5.5 | 5.0 | 4.6 |
| B | 4,0 | 3,6 | 3,0 |
| C | 3,3 | 3,0 | 2,6 |
| D | 3,1 | 2,8 | 2,4 |
| E | 2,8 | 2,4 | 2,2 |
| F | 2.4 2.2 2.0 | ||
New parameter for 55% "re-building" with biomass boilers
Finally replaced the paragraph 3 of art. Dm 3 of 11 March 2008, introducing for the biomass boilers a new parameter calculation of primary energy needs in the case of the overall rehabilitation of the building. The new decree stipulates that "assumes an equal share of fossil energy to primary energy actually delivered to the system multiplied by a factor of 0.3.
recited paragraph 3: "For the sole purpose of access to deductions for income tax under Article 1, paragraph 344 (...), for calculating the energy performance resulting in the installation of boilers to biomass, which meet the minimum performance (...) the calorific value of biomass is considered zero. " (For more details on this and other aspects, see "The case of biomass boilers" in the References at the end of the news).
a) have a performance Minimum useful according to class 3, according to the European UNI-EN 303-5;
b) rispettare i limiti di emissione , stabiliti dalla sezione 2 dell'allegato IX alla parte quinta del dlgs 152/2006 e successive modifiche e integrazioni, oppure i più restrittivi limiti fissati da norme regionali, se presenti;
c) utilizzare biomasse combustibili ricadenti fra quelle ammissibili ai sensi della sezione 4 dell'allegato X alla parte quinta del dlgs 152/2006 e successive modifiche e integrazioni. La rispondenza a tali requisiti deve essere riportata nell’asseverazione compilata dal tecnico abilitato.
Per conoscere arrangements for access to 55% deductions under current rules, see pages dedicated Nextville in the References below. These pages will updated with changes made by DM January 26, 2010, from March 15, 2010, date of entry into force of the decree.